Posts

Showing posts from April, 2015

Manufacturing the Keel Pockets (video)

Image
53-10-08.100 Keel Pocket Another series and building the EMG-6. In this video we look at the process of manufacturing the keel pockets.

53-40-12 Lower Keel (Video)

Image
53-40-12 Lower Keel Building the EMG-6: in this video we look at the installation of the fuselage lower keel assembly

Aero Towing the EMG-6 With the Quicksilver GT 500

Image
Aero Towing the EMG-6 With the Quicksilver GT 500 In this video we look at the Aero towing process using the EMG-6 and the Quicksilver GT 500 with a Rotax 582 two-stroke engine as the tow plane.

53-40-11 Upper Keel (Video)

Image
53-40-11 Upper Keel Building the EMG-6: in this video we show the installation procedures for the upper keel assembly

53-10-06A Instrument Panel (Video)

Image
53-10-06A Instrument Panel Building the EMG-6: In this video we installed the instrument panel bulkhead subassembly

April 2015 Progress Blog

Image